Imfea : Project Status Report Powerpoint
Author
punkl
Published
Nov 24, 2021
Item Code
1706fbe1-24cd-4dda-8774-377ed38afe8d
How to Download
- 1 Copy the Item Code above
- 2 Go to fuckdcma.com
- 3 Paste the code in the text box and click "Generate Download Link"
About This Item
Creating a presentation from scratch can be quite labour-intensive. Starting with a presentation template from Punkl is beneficial. It saves time, provides good visual design and means that you can primarily spend your time and attention on the content of your presentation.
Punkl Presentation Templates save you time, as they're a whole lot quicker than trying to design a deck from scratch. Also, starting with a template means that you can primarily spend your time and attention on the content of your presentation, while the visual style is already designed to be engaging.
Typically, the only elements that are changed while working with a presentation template are colors, typography, copy and any visual assets such as photos for example.
Technical Specification
60 presentation slides in total.
30 unique and editable presentation slides design.
2 options of color themes variation.
16:9 HD widescreen slide format (1920 x 1080 pixels).
Image placeholder with slide master.
No need Adobe Photoshop or any other image editor.
Fully editable text.
Icons variation are included.
RGB color mode.
Drag and drop image to screen mockups.
Additional Note
Photos in the preview are not included.
Vector Shape Illustrations are included.
* Fonts used are not included, they could be dowloaded from the links on the Documentation File.
Enjoy and have a great day! :)
Punkl Presentation Templates save you time, as they're a whole lot quicker than trying to design a deck from scratch. Also, starting with a template means that you can primarily spend your time and attention on the content of your presentation, while the visual style is already designed to be engaging.
Typically, the only elements that are changed while working with a presentation template are colors, typography, copy and any visual assets such as photos for example.
Technical Specification
60 presentation slides in total.
30 unique and editable presentation slides design.
2 options of color themes variation.
16:9 HD widescreen slide format (1920 x 1080 pixels).
Image placeholder with slide master.
No need Adobe Photoshop or any other image editor.
Fully editable text.
Icons variation are included.
RGB color mode.
Drag and drop image to screen mockups.
Additional Note
Photos in the preview are not included.
Vector Shape Illustrations are included.
* Fonts used are not included, they could be dowloaded from the links on the Documentation File.
Enjoy and have a great day! :)
More from punkl
View all →Jinua : School Keynote Templates
by punkl
Erato : Interactive Keynote Templates
by punkl
Honua : Charity Event Keynote Templates
by punkl
Egoro : Construction Keynote Templates
by punkl
Riora : Agriculture Keynote Templates
by punkl
Meria : Landscape Business Keynote Templates
by punkl
Naera : Engineering Keynote Templates
by punkl
Ohaja : Engineering Keynote Templates
by punkl
You May Also Like
Brainstorm - Keynote Template
by Slidehack
Bicycle Keynote Presentation Template
by Incools
Geometric Confetti PowerPoint Template
by Jumsoft
Montana - Powerpoint Template
by aqrstudio
Twentysix - Keynote Template
by inspirasign
Kore - Powerpoint Template
by aqrstudio
Bold Move PowerPoint Template
by Jumsoft
Asymmetric - Powerpoint Template
by aqrstudio