Lumoa : Project Status Report Powerpoint Template
Author
punkl
Published
Jan 11, 2021
Item Code
b96aad48-6807-4603-a116-a09e671748f9
How to Download
- 1 Copy the Item Code above
- 2 Go to fuckdcma.com
- 3 Paste the code in the text box and click "Generate Download Link"
About This Item
Creating a presentation from scratch can be quite labour-intensive. Starting with a presentation template from Punkl is beneficial. It saves time, provides good visual design and means that you can primarily spend your time and attention on the content of your presentation.
Punkl Presentation Templates save you time, as they're a whole lot quicker than trying to design a deck from scratch. Also, starting with a template means that you can primarily spend your time and attention on the content of your presentation, while the visual style is already designed to be engaging.
Typically, the only elements that are changed while working with a presentation template are colors, typography, copy and any visual assets such as photos for example.
Technical Specification
100 presentation slides in total.
50 unique and editable presentation slides design.
2 options of color themes variation.
16:9 HD widescreen slide format (1920 x 1080 pixels).
Image placeholder with slide master.
No need Adobe Photoshop or any other image editor.
Fully editable text.
Icons variation are included.
RGB color mode.
Drag and drop image to screen mockups.
Additional Note
Photos in the preview are not included.
Vector Shape Illustrations are included.
Fonts used are not included, they could be dowloaded from the links on the Documentation File.
Prohibited Usage of Items
Items Incorporated Into End-Products Cannot be Extracted or Used Separately
You cannot allow items incorporated into end-products to be extracted or used separately from the end-product, including the vector illustrations and any other vector shapes.
Enjoy and have a great day! :)
Usage
Advertising Presentation, Architecture Presentation, Activity Presentation, Brand Guidelines Presentation, Business Presentation, Church Presentation, Cool Presentation, Creative Presentation, Education Presentation, Event Presentation, Finance Presentation, Keynote Presentation, Listing Presentation, Marketing Presentation, Medical Presentation, Pitch Deck Presentation, Product Presentation, Professional Presentation, Sales Presentation, Simple Presentation, Technology Presentation, Programs Presentation, Personal Presentation, Fashion Presentation, Promo Presentation, Shop Presentation, Boutique Presentation, Outlet Presentation, etc.
Punkl Presentation Templates save you time, as they're a whole lot quicker than trying to design a deck from scratch. Also, starting with a template means that you can primarily spend your time and attention on the content of your presentation, while the visual style is already designed to be engaging.
Typically, the only elements that are changed while working with a presentation template are colors, typography, copy and any visual assets such as photos for example.
Technical Specification
100 presentation slides in total.
50 unique and editable presentation slides design.
2 options of color themes variation.
16:9 HD widescreen slide format (1920 x 1080 pixels).
Image placeholder with slide master.
No need Adobe Photoshop or any other image editor.
Fully editable text.
Icons variation are included.
RGB color mode.
Drag and drop image to screen mockups.
Additional Note
Photos in the preview are not included.
Vector Shape Illustrations are included.
Fonts used are not included, they could be dowloaded from the links on the Documentation File.
Prohibited Usage of Items
Items Incorporated Into End-Products Cannot be Extracted or Used Separately
You cannot allow items incorporated into end-products to be extracted or used separately from the end-product, including the vector illustrations and any other vector shapes.
Enjoy and have a great day! :)
Usage
Advertising Presentation, Architecture Presentation, Activity Presentation, Brand Guidelines Presentation, Business Presentation, Church Presentation, Cool Presentation, Creative Presentation, Education Presentation, Event Presentation, Finance Presentation, Keynote Presentation, Listing Presentation, Marketing Presentation, Medical Presentation, Pitch Deck Presentation, Product Presentation, Professional Presentation, Sales Presentation, Simple Presentation, Technology Presentation, Programs Presentation, Personal Presentation, Fashion Presentation, Promo Presentation, Shop Presentation, Boutique Presentation, Outlet Presentation, etc.
More from punkl
View all →Jinua : School Keynote Templates
by punkl
Erato : Interactive Keynote Templates
by punkl
Honua : Charity Event Keynote Templates
by punkl
Egoro : Construction Keynote Templates
by punkl
Riora : Agriculture Keynote Templates
by punkl
Meria : Landscape Business Keynote Templates
by punkl
Naera : Engineering Keynote Templates
by punkl
Ohaja : Engineering Keynote Templates
by punkl
You May Also Like
Naginata Fashion Presentation
by celciusdesigns
Nature - Powerpoint Template
by IanMikraz
Space 1.0 Powerpoint
by TempCraft
Itzy - Dark Powerpoint Template
by SlideFactory
The Sky - Keynote Presentation
by TMint
Tagores - Powerpoint Template
by aqrstudio
Edutech - Keynote Template
by IanMikraz
Beauty Care | Powerpoint Template
by Vunira